COIL COMPLETE WITH LONG LEAD

SKU: 0015/073943

Ignition Coil complete with long electrical leads this component is designed for precise integration ensuring reliable 24-volt firing and starting performance in fuel-fired heating units that feature a burner head rotated 90 degrees.

  • Complete ignition coil assembly built for consistent system performance.
  • Engineered to operate reliably within 24-volt electrical heating systems.
  • Supplied with extended electrical leads for necessary reach and flexible installation.
  • Specific geometry required for compatibility with heating units where the burner head is positioned at a 90-degree angle

Items you may also like

0
    0
    Your Cart
    Your cart is emptyReturn to Shop